STARDOLMEDIA / OOH & DOOH
Subway / Rail
No items found.

E-Vision

E-Vision

Reach passengers through LED displays at 12 spots across 10 key Seoul subway stations on Lines 2–4. Wall, canopy and freestanding displays sit along transfer passages and exit routes. With 2 mm pixel pitch and sound support, E-Vision offers campaigns across the full network or on individual screens.

SEOUL · SUBWAY LINES 2–4 · 12 LED SPOTS

Your campaign along the routes of 10 key subway stations

Reach passengers through LED displays at 12 spots across 10 key Seoul subway stations on Lines 2–4. Wall, canopy and freestanding displays sit along transfer passages and exit routes. With 2 mm pixel pitch and sound support, E-Vision offers campaigns across the full network or on individual screens.

Seoul · Lines 2–4 · 10 stations / 12 spots

Media category · Subway / Rail

05:00–01:00Operating hours · 20 hours/day
10 stations12 spots · 3 at Hongik University
20 secStandard creative duration
7 daysMinimum campaign

On passenger transfer and exit routes

Displays sit at passageways, stairways and gates, using wall, canopy and freestanding formats suited to each station.

Choose the network or an individual screen

Use all 12 spots for a network campaign or select individual screens for a focused local campaign. Both options require at least one week.

01 · FULL NETWORK PACKAGE

Full package rates

All rates exclude VAT. Playback counts below apply to 20-second creative.

1 slot

20 seconds · 120+ plays/day

1 weekKRW 10,000,000
1 monthKRW 40,000,000

0.5 slot

20 seconds · 60+ plays/day

1 weekKRW 5,000,000
1 monthKRW 20,000,000

Individual screens can also be booked for at least one week. The rates in the spot guide below are per month for one slot. Contact us for pricing for other periods and confirm availability before booking.

02 · STATION & SPOT GUIDE

Location maps, on-site photos and media specifications

The dimensions below are physical module dimensions, width × height in millimetres. They are not the video production resolution. All displays use a 2 mm pixel pitch.

SPOT 01 · LINE 2

Gangnam Station

Above Stairway F toward Sadang · toward Exits 10 and 11

2,304 × 2,560 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Gangnam Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Gangnam Station · E-Vision on-site photo
Gangnam Station · On-site photo

SPOT 02 · LINE 2

Hongik University · AREX transfer passage

Facing the Line 2–AREX transfer passage

6,912 × 1,920 mmModule dimensions · Width × height
Freestanding displayMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,500,000

INSTALLATION MAP

Hongik University · AREX transfer passage · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Hongik University · AREX transfer passage · E-Vision on-site photo
Hongik University · AREX transfer passage · On-site photo

SPOT 03 · LINE 2

Hongik University · Exit 8

Exit 8 passage toward the Hongdae entertainment district

2,048 × 1,664 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Hongik University · Exit 8 · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Hongik University · Exit 8 · E-Vision on-site photo
Hongik University · Exit 8 · On-site photo

SPOT 04 · LINE 2

Hongik University · Exit 9

Exit 9 passage toward the Hongdae entertainment district

2,048 × 1,664 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,500,000

INSTALLATION MAP

Hongik University · Exit 9 · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Hongik University · Exit 9 · E-Vision on-site photo
Hongik University · Exit 9 · On-site photo

SPOT 05 · LINE 2

Sindorim Station

Above the escalator in the Line 1–2 transfer passage

3,584 × 1,792 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Sindorim Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Sindorim Station · E-Vision on-site photo
Sindorim Station · On-site photo

SPOT 06 · LINE 2

Jamsil Station

Wall above Stairway E to the gates · route toward Lotte World

2,560 × 1,920 mmModule dimensions · Width × height
Wall displayMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 3,000,000

INSTALLATION MAP

Jamsil Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Jamsil Station · E-Vision on-site photo
Jamsil Station · On-site photo

SPOT 07 · LINE 2

Dongdaemun History & Culture Park Station

Line 2–5 transfer passage · route connecting Lines 2, 4 and 5

3,584 × 2,048 mmModule dimensions · Width × height
Freestanding displayMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Dongdaemun History & Culture Park Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Dongdaemun History & Culture Park Station · E-Vision on-site photo
Dongdaemun History & Culture Park Station · On-site photo

SPOT 08 · LINE 2

Konkuk University Station

Facing the Line 2–7 transfer passage

4,096 × 2,048 mmModule dimensions · Width × height
Wall displayMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Konkuk University Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Konkuk University Station · E-Vision on-site photo
Konkuk University Station · On-site photo

SPOT 09 · LINE 3

Express Bus Terminal Station

Facing the Line 3–7 transfer passage

4,352 × 1,536 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,000,000

INSTALLATION MAP

Express Bus Terminal Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Express Bus Terminal Station · E-Vision on-site photo
Express Bus Terminal Station · On-site photo

SPOT 10 · LINE 3

Sinsa Station

Exit 8 passage toward Garosu-gil

3,072 × 1,408 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 3,000,000

INSTALLATION MAP

Sinsa Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Sinsa Station · E-Vision on-site photo
Sinsa Station · On-site photo

SPOT 11 · LINE 4

Sadang Station

Facing the Line 2–4 transfer passage

3,584 × 1,280 mmModule dimensions · Width × height
Wall canopyMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 3,000,000

INSTALLATION MAP

Sadang Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Sadang Station · E-Vision on-site photo
Sadang Station · On-site photo

SPOT 12 · LINE 4

Myeongdong Station

Facing the stairs to Exits 5 and 6 · route to the Myeongdong shopping district

4,608 × 1,920 mmModule dimensions · Width × height
Wall displayMedia format · 2 mm pixel pitch
1 slot / month · VAT excludedKRW 4,500,000

INSTALLATION MAP

Myeongdong Station · E-Vision installation map
Select the map to view it at full size.

ON-SITE PHOTO

Myeongdong Station · E-Vision on-site photo
Myeongdong Station · On-site photo

03 · CREATIVE GUIDE

Creative guide and delivery

Screen-specific production specifications

The required production resolution differs by screen. Contact us for the detailed specifications and delivery requirements for your selected spots. Physical dimensions shown above are not creative pixel dimensions.

Supported formats and sound

Supported formats include MP4 (H.264), JPG and PNG. Sound playback is available. Confirm the detailed creative requirements before production.

Creative review before playback

Creative and scheduling requirements are confirmed before playback. Please check the booking and submission schedule in advance.

Creative deadline · 7 business days before launch

Submit final creative in time for your confirmed campaign schedule.

Tell us your preferred stations, spots and campaign dates.

Advertising inquiry ↗

Select your options

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.