STARDOLMEDIA / OOH & DOOH
Airports
No items found.

Jeju Airport Domestic · 1F Arrivals LED (DL-1)

Jeju Airport Domestic · 1F Arrivals LED (DL-1)

Carousel and pillar LEDs in the domestic arrivals hall reach passengers while they wait for their baggage. The package plays across 25 faces on 10 displays, covering the waiting area and the route toward the terminal exit.

JEJU AIRPORT · DOMESTIC · DL-1

Reach arriving passengers at baggage claim

Carousel and pillar LEDs in the domestic arrivals hall reach passengers while they wait for their baggage. The package plays across 25 faces on 10 displays, covering the waiting area and the route toward the terminal exit.

Jeju Airport Domestic · 1F Arrivals

Media category · Airport

06:00–22:00Operating hours · 16 hours/day
15 secCreative length
150+ plays/dayMinimum daily plays
7 days+Minimum campaign

01 · DISPLAY CONFIGURATION

Display configuration and dimensions

10 displays · 25 faces in sync

Carousel · 2.25 × 1.25 m5 displays · 10 faces
Pillar · 1.5 × 2.81 m4 displays · 12 faces
Extended pillar · 3 × 2.81 m1 display · 3 faces

These are physical display dimensions. Creative pixel dimensions are specified separately.

02 · ADVERTISING RATES

Advertising rates

Rates per advertising slot

Minimum 7 days · VAT excluded

7 daysKRW 6,000,000
1 monthKRW 20,000,000

Package elements cannot be purchased individually. One creative design per display type is allowed. Availability and slots must be confirmed for your preferred dates.

03 · INSTALLATION MAP

Installation map

Jeju Airport Domestic · 1F Arrivals LED (DL-1) installation map

04 · ON-SITE PHOTOS

On-site photos

Jeju Airport Domestic · 1F Arrivals LED (DL-1) on-site photo 1
DL-1 · On-site photo 01
Jeju Airport Domestic · 1F Arrivals LED (DL-1) on-site photo 2
DL-1 · On-site photo 02

05 · CREATIVE GUIDE

Creative guide and submission

Request the production guide

Contact us for screen-specific creative resolutions and submission requirements. Confirm the detailed guide before production.

20-second creative cannot be played. Creative approval by Jeju Airport is required before the campaign.

Creative deadline · 7 business days before launch

Submit final creative for approval in time for your confirmed campaign schedule.

Tell us your preferred display and campaign dates.

Advertising inquiry ↗

Select your options

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.