STARDOLMEDIA / OOH & DOOH

Subway Screen Door (PSD)

Subway Screen Door (PSD)

Illuminated image advertising on subway platform screen doors. Choose a station and placement suited to your campaign.

SUBWAY · PLATFORM SCREEN DOOR

At the platform, in clear view

Illuminated image advertising on subway platform screen doors. Choose a station and placement suited to your campaign.

Media typeSubway / Rail
LocationSeoul metropolitan subway
FormatIlluminated image
Operating hours24 hours
Minimum bookingVaries by line
Advertising feePlease inquire

On-site photos

Special

Large

Advertising and production fees

Advertising fee · Please inquire

Advertising fees vary by station and placement. The minimum campaign period also varies by line. Tell us your preferred station and dates for a quote.

Production fees by format

FormatPrintingBack panelTotal
SpecialKRW 200,000KRW 90,000KRW 290,000
LargeKRW 170,000KRW 60,000KRW 230,000

Removal costs are billed to the advertiser. The panel replacement charge applies only when replacing with a backing panel. The total shown includes printing and that replacement charge.

Station grades · 2026

Check the station grade and whether a regular display is installed. Availability and advertising fees are confirmed separately.

LineSSASAANo regular display
Line 1JonggakSeoul Station · City Hall · Jongno 3(sam)-ga · Jongno 5(o)-ga · CheongnyangniJegi-dongDongdaemun · Dongmyo · Sinseol-dong
Line 2Gangnam · Konkuk Univ. · Seoul Nat'l Univ. of Education · Guro Digital Complex · Sadang · Samseong · Seolleung · Sindorim · Sinchon · Yeoksam · Euljiro 3(sam)-ga · Euljiro 1(il)-ga · Jamsil · Hapjeong · Hongik Univ.Gangbyeon · Dangsan · Daerim · Mullae · Seoul Nat'l Univ. · City Hall · Sillim · Wangsimni · Euljiro 4(sa)-ga · Jamsilsaenae · ChungjeongnoGuui · Nakseongdae · Ttukseom · Bangbae · Bongcheon · Seocho · Seongsu · Sindang · Sindaebang · Sinjeongnegeori · Ahyeon · Yangcheon-gu Office · Yeongdeungpo-gu Office · Ewha Womans Univ. · Jamsillaru · Hanyang Univ.Kkachisan · Dorimcheon · Dongdaemun History & Culture Park · Sangwangsimni · Sindap · Sinseol-dong · Yongdap · Yongdu · Sports Complex
Line 5Yeouido · GwanghwamunGongdeok · Gunja · Gimpo Int'l Airport · Kkachisan · Dongdaemun History & Culture Park · Balsan · Seodaemun · Yeongdeungpo-gu Office · Omokgyo · Wangsimni · Jongno 3(sam)-ga · Cheonho · Hwagok · Dunchon-dong · YeouinaruGangdong · Gaerong · Gaehwasan · Geoyeo · Godeok · Gwangnaru · Gubeundari · Gil-dong · Dapsimni · Magok · Mapo · Myeongil · Mok-dong · Bangi · Sangil-dong · Songjeong · Singeumho · Singil · Sinjeong · Achasan · Aeogae · Yangpyeong · Yeongdeungpo Market · Ogeum · Olympic Park · Ujangsan · Euljiro 4(sa)-ga · Janghanpyeong · Cheonggu · Chungjeongno · HaengdangMajang · Macheon · Banghwa
Line 7Express Bus TerminalGasan Digital Complex · Gangnam-gu Office · Konkuk Univ. · Gunja · Gwangmyeongsageori · Nowon · Nonhyeon · Daerim · Dobongsan · Myeonmok · Sangbong · Onsu · Isu · Cheolsan · Cheongdam · Hak-dongGongneung · Namguro · Namseong · Naebang · Ttukseom Resort · Madeul · Meokgol · Banpo · Boramae · Sagajeong · Sangdo · Suraksan · Soongsil Univ. · Sinpung · Children's Grand Park · Yongmasan · Jangseungbaegi · Junggye · Junggok · Junghwa · Cheonwang · Taereung · HagyeJangam
Line 8—Garak Market · Munjeong · Bokjeong · Jamsil · CheonhoGangdong-gu Office · Namwirye · Namhansanseong · Dandaeogeori · Moran · Mongchontoseong · Sanseong · Seokchon · Songpa · Sujin · Sinheung · Amsa · Jangji—

Dunchon-dong and Yeouinaru on Line 5 are graded SA.

Creative guide

Dimensions vary by station and placement. Confirm the final measurements before production. All dimensions below are in millimetres.

Special

Visible creative area
Nominal size3,300 × 1,700 mm
Outer / cut size3,240 × 1,670 mm
Inner / visible area3,220 × 1,650 mm

Fire-retardant fabric

Large

Visible creative area
Nominal size2,600 × 1,700 mm
Outer / cut size2,430 × 1,670 mm
Inner / visible area2,410 × 1,650 mm

Fire-retardant fabric

Place all essential text and artwork inside the visible area.

  • Korean text must accompany the advertising copy.
  • AI (Adobe Illustrator) file in CMYK at actual size.
  • 300 dpi at actual size, with a minimum of 200 dpi.
  • File size: at least 500 MB.
  • Outline all fonts and include images in a single file.
  • Print on fire-retardant fabric. Remove the fabric edges before post-processing.

Before booking

  • The minimum campaign period varies by line.
  • Confirm the station, placement, size and total quote before booking.
  • Submit final creative 7 business days before the campaign begins.
  • Korean advertising copy is required.
Advertising inquiry

Select your options

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.